WTE Plant of Gioia Tauro, lines 1-2-3-4

Key information
Location
Gioia Tauro, Calabria
Client
Regione Calabria (Grantor) – TME & Others (Concessionaire)
Services provided
Definitive design, executive design
Investment
~ € 300 mln

Treatment capacity: 100,000 + 100,000 + 100,000 + 100,000 t/y of RDF for a total of 400,000 t/y of treated fuel
Technology: Combustion in a fluidized bed furnace with energy recovery
Energy production
Line 1 & 2
Fuel: 8.6 t/h at NC up to 9.5 t/h at MCR
Thermal power: 30 – 33 MW
Steam produced: 9.9 – 10.9 kg/s
Electricity generated: ~15.6 MW
Line 3 & 4
Fuel: 10.8 t/h at NC up to 12 t/h at MCR
Thermal power: 33.3 – 36.9 MW
Steam produced: 12.4 – 13.8 kg/s
Electricity generated: ~22 MW
Flue gas treatment system
NOx reduction with SNCR/SCR
Acid neutralization with sodium bicarbonate
Double stage filtration with electrostatic precipitator and bag filter
Micropollutant control with PAC